Update of PG study

Testing the stations

On the 10th of Feb 2009 the 1st follow up report was submitted to the Road & Bridge Department. The report presents the current condition of the study. The report contains information about the instruments and equipments imported for the field study. It also reports the progress of construction and installation of the monitoring stations in different parts of the country. The report shows a sample of the results recorded by number of stations that entered the service by the date of the report.

Data sample